Gas module for Orbost Gas Plant

Tradeweld Gas Module for Orbost Gas Plant

Client: Downer EDI Engineering Power Pty Ltd

Tradeweld was engaged by Downers in 2018/2019 to assist in works for the Orbost Gas Plant Upgrade.

The scope of works included:

  • Pipe rack assembly into modules
  • Skid assembly
  • Miscellaneous complementary items

All of the works were completed in a professional and timely manner to the satisfaction of our customer Downer EDI Engineering Power Pty Ltd.

Pictured below see the team loading the extra wide and long modules onto the truck before the journey to Orbost.

Loading the Gas Module for Orbost Gas Plant at Tradeweld

Loading the Gas Module for Orbost Gas Plant at Tradeweld

Loading the Gas Module for Orbost Gas Plant at Tradeweld

Loading the Gas Module for Orbost Gas Plant at Tradeweld

Loading the Gas Module for Orbost Gas Plant at Tradeweld

Loading the Gas Module for Orbost Gas Plant at Tradeweld

On the truck- the Gas Module for Orbost Gas Plant at Tradeweld On the truck- the Gas Module for Orbost Gas Plant at Tradeweld